Description This test consisted of two road embankments. One was built on MDM plilings the other on standard dry method columns.
The embankment foundations were monitored for settlement, pore pressure and actual loads on the columns to evaluate the performance of the two methods over some time.
|
|
|
Contractor/Entrepreneur
- Hercules Grundlägning AB
- LC Technology, Inc.
|
Status
|
|
|